UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 8-K
CURRENT REPORT
Pursuant to Section 13 or 15(d) of
The Securities Exchange Act of 1934
Date of Report (Date of earliest event reported):
February 8, 2013
American Superconductor Corporation
(Exact name of registrant as specified in its charter)
Delaware |
0-19672 |
04-2959321 | ||
(State or other jurisdiction of incorporation) |
(Commission File Number) |
(IRS Employer Identification No.) |
64 Jackson Road Devens, Massachusetts |
01434 | |
(Address of principal executive offices) | (Zip Code) |
Registrants telephone number, including area code (978) 842-3000
Not Applicable
(Former name or former address, if changed since last report.)
Check the appropriate box below if the Form 8-K filing is intended to simultaneously satisfy the filing obligation of the registrant under any of the following provisions (see General Instruction A.2. below):
¨ | Written communications pursuant to Rule 425 under the Securities Act (17 CFR 230.425) |
¨ | Soliciting material pursuant to Rule 14a-12 under the Exchange Act (17 CFR 240.14a-12) |
¨ | Pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act (17 CFR 240.14d-2(b)) |
¨ | Pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act (17 CFR 240.13e-4(c)) |
Item 1.01 | Entry into a Material Definitive Agreement. |
On February 8, 2013, American Superconductor Corporation (the Company) entered into a Supply Contract with Inox Wind Limited (Inox). The aggregate contract value of the Supply Contract is approximately $32 million. During the term of the Supply Contract, Inox has agreed to purchase electric control systems from the Company. The Supply Contract provides that shipments to Inox are scheduled to begin in March 2013 and span over a 17-month period.
The foregoing description of the Supply Contract does not purport to be complete and is qualified in its entirety by reference to the full text of the Supply Contract, which is filed as Exhibit 10.1 to this Current Report on Form 8-K and is incorporated by reference herein.
Item 9.01. | Financial Statements and Exhibits. |
(d) Exhibits.
+ 10.1 Supply Contract, effective as of February 8, 2013, by and between Inox Wind Limited and American Superconductor Corporation.
+ | Confidential treatment has been requested with respect to certain portions of this exhibit, which portions have been filed separately with the Securities and Exchange Commission. |
2
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned hereunto duly authorized.
AMERICAN SUPERCONDUCTOR CORPORATION | ||||||||
Date: February 14, 2013 | By: | /s/ David A. Henry | ||||||
David A. Henry Senior Vice President and Chief Financial Officer |
3
EXHIBIT INDEX
Exhibit |
Description | |
+10.1 | Supply Contract, effective as of February 8, 2013, by and between Inox Wind Limited and American Superconductor Corporation. |
+ | Confidential treatment has been requested with respect to certain portions of this exhibit, which portions have been filed separately with the Securities and Exchange Commission. |
4
EXHIBIT 10.1
Confidential Treatment Requested by
American Superconductor Corporation
Supply Contract for [**] sets of
DF2000/ 50Hz Electric Control Systems
(According to GL2003/2004 guideline)
for the WT2000DF Wind Turbine
Date: 29th January 2013
Contract NO: PPC1687-132012
Pages: 11
The Buyer:
Inox Wind Limited
Inox Towers, 17 Sector-16A
Noida, Uttar Pradeshi 201301, India
The Seller:
American Superconductor
64 Jackson Road
MA 01434 Devens
USA
This Supply Contract (the Contract) is made by and between the Buyer and the Seller, whereby the Buyer agrees to buy and the Seller agrees to sell the under mentioned commodity according to the terms and conditions stipulated below:
1. Scope of Supply and Contract Price:
1.1. | [**] ([**]) sets of Electric Control System (hereinafter ECS) [**] and Condition Monitoring System (CMS). Each set comprising of: |
# |
ELECTRIC CONTROL SYSTEM |
Windtec ID | units per WEC | Scope of supply | ||||
1 | Hub Cabinets including Pitch Motor | 26109798 | 1 set | 1 set consist of:
1pcs 26109799 hub cabinet +HC400
1pcs 26109801 hub cabinet +HC410
1pcs 26109803 hub cabinet +HC420
each hub cabinet includes pitch converter with IOs, heater, service switch and service plug
3 pcs No.10113398 or No.10113715 pitch motors including cables for motor and speed feedback connection. Each pitch motor with free wheel system, brake and speed feedback.
Industrial connector |
Confidential Portions of this Exhibit marked as [**] have been omitted pursuant to a request for
confidential treatment and have been filed separately with the Securities and Exchange Commission.
Confidential Treatment Requested by
American Superconductor Corporation
2 |
Nacelle Cabinet +NC300 +NC310 |
1) 26109896 | 1 | 1 unit fully assembled and tested cabinet includes:
auxiliary power supply
auxiliary control and protection
contactors and relays
PLC IOs
control panel
YAW converter
lightning protection (acc. lightning protection system)
UPS power supply 24VDC with batteries
service switch and service plug
service box
connection terminals | ||||
3 | Converter Cabinet +CC100 +CC101 |
26109809 | 1 | 1 fully assembled and tested cabinet includes:
AMSC power module (PM3000 with pre charge unit)
CAN Interface
filter capacitors and resistors
generator and line choke
contactors and relays
cooling units
crowbar unit
filter system (e.g. chokes etc.)
circuit breaker
water cooling distribution
total power measurement
lightning protection (acc. lightning protection system)
connection terminals | ||||
4 | Tower Base Cabinet +TBC100Internal Power Supply Cabinet +IPS100 |
26109899 | 1 | 1 unit fully assembled and tested cabinet includes:
PLC and PLC IOs
Relays, fuses, control panel,
Power supply with built in UPS system
Service plugs
Lighting protection (acc. Lightning protection system)
Cable glands
1 unit fully assembled and tested cabinet includes:
auxiliary control and protection
contactors and relays
PLC IOs and CPU
UPS power supply 24VDC with batteries
service switch
control panel
connection terminals |
Confidential Portions of this Exhibit marked as [**] have been omitted pursuant to a request for
confidential treatment and have been filed separately with the Securities and Exchange Commission.
Confidential Treatment Requested by
American Superconductor Corporation
5 | SCADA package including wtDataCenter | 26112620 | 1 | Configuration tool
Wind farm overview page
User management
LiveDataCollector
RecordedDataCollector
Live data pages
Report generation
Alarms and notifications
Remote update application
Time application
Enhanced analysing and report tool
Correct description:
wtSCADA Server: SCADA system for wind farm server
wtSCADA Client: GUI to visualize all monitored turbines
wtCommissioner: SCADA system for commissioning and trouble shooting
wtDataCenter: Analysis tool for Licensed wind turbines and wind farms
Detailed document for each of the above mentioned software packages | ||||
6 | Over Voltage Protection Cabinet +OVP400 |
26109796 | 1 |
lightning protection (acc. lightning protection system)
industrial connector | ||||
7 | Control Software | 26112620 | 1 |
Control software for yaw-, pitch-, converter system and PLC
Correct description:
Control software for yaw-, pitch-, converter system and PLC
software description including parameter, warning and error description, hardware module descript |
1.2 The ECS sets shall be completely new, advanced in technology and reliable. In the event Buyer desires Seller to provide ECS that are compatible with GL 2010 when it is implemented, such change shall be negotiated and added to this contract by a mutually agreed amendment signed by the parties.
1.3 The price for each of the [**] ([**]) ECS, FCA Shanghai, China and/or any place in Austria, excluding VAT shall be: EUR [**] (EURO [**] ONLY). The price for the total [**] ([**]) sets, FCA Shanghai, China and/or any place in Austria, excluding VAT shall be: EUR 23,950,000.00 (EURO TWENTY THREE MILLION NINE HUNDRED FIFTY THOUSAND ONLY).
TOTAL CONTRACT PRICE:
The total contract price, FCA Shanghai, China and/or any place in Austria, of the ECS, excluding VAT shall be: EUR 23,950,000.00 (EURO TWENTY THREE MILLION NINE HUNDRED FIFTY THOUSAND ONLY).
1.4 The ECS sets shall be completely new, advanced in technology and reliable.
Confidential Portions of this Exhibit marked as [**] have been omitted pursuant to a request for
confidential treatment and have been filed separately with the Securities and Exchange Commission.
Confidential Treatment Requested by
American Superconductor Corporation
1.5 If Buyers financial condition at any time does not justify continuance of the work to be performed by Seller hereunder on the agreed terms of payment, Seller may require full or partial payment in advance and suspend further delivery until such payment is paid. In the event of Buyers bankruptcy or insolvency or in the event any proceeding is brought against Buyer, voluntarily or involuntarily, under the bankruptcy or any insolvency laws, Seller shall be entitled to cancel any order then outstanding at any time during the period allowed for filing claims against the estate and shall receive reimbursement for its proper cancellation charges. Sellers rights under this Article are in addition to all rights available to it at law or in equity.
2. Delivery Period:
2.1 The Sets of ECS shall be delivered according to the time and quantity below. The delivery plan can be changed by written agreement of the Parties with a six month advance notice.
Despatch Schedule for an order of [**] Sets.
Sl No |
Despatch FCA Shangahi, China and/or any place in Austria |
Quantity | ||
1 | March 2013 | [**] | ||
2 | April 2013 | [**] | ||
3 | May 2013 | [**] | ||
4 | June 2013 | [**] | ||
5 | July 2013 | [**] | ||
6 | August 2013 | [**] | ||
7 | September 2013 | [**] | ||
8 | October 2013 | [**] | ||
9 | November 2013 | [**] | ||
10 | December 2013 | [**] | ||
11 | January 2014 | [**] | ||
12 | February 2014 | [**] | ||
13 | March 2014 | [**] | ||
14 | April 2014 July 2014 | [**] | ||
Total | [**] |
2.2 The terms and conditions of delivery shall be interpreted in accordance with INCOTERMS 2010 (International Commercial Terms) and its supplements published by the International Chamber of Commerce. Delivery of the ECS or any part thereof at FCA Shanghai, China and / or any place in Austria, is to the sole discretion of Seller.
3. Payment Conditions:
1) | Down payment, equivalent to [**]% of total value of ECS, for the numbers to be despatched 4 months before the shipment of the ECS and will be paid by Telegraphic Transfer against commercial invoice from Seller. |
2) | Four weeks before each shipment according to table in article 2.1, an irrevocable Letter of Credit (L/C) in a form and format acceptable to the Seller and in an amount of [**]% of each shipment value shall be issued by a first-class bank. |
The L/C shall be according to UCP 600. The L/C shall be valid for 60 days and shall include provisions for deferred payment by the Buyer of [**] days from the date of FCR (Forwarders Certificate of Receipt), and all interest charges shall be to the account of the Buyer/applicant. L/C charges in India shall be borne by the Buyer and All L/C charges outside India shall be borne by the Seller. If said L/C is not issued within the specified time frame, the associated shipment date will be extended accordingly.
(3) | The Seller may, by written notice of default sent to Buyer, terminate the Contract in whole or in part, if Buyer fails to arrange payment as provided in this Article and such breach continues for more than one hundred and twenty (120) days |
Confidential Portions of this Exhibit marked as [**] have been omitted pursuant to a request for
confidential treatment and have been filed separately with the Securities and Exchange Commission.
Confidential Treatment Requested by
American Superconductor Corporation
(4) | Bank information of the Parties is as follows: |
Buyer: | ICICI Bank Limited (Vadodara Branch) Landmark, Race Course Circle Vadodara 390007, Gujarat, India | |
YES Bank Ltd. 102/103, CG Centre CG Road, Panchwati, Ahmedabad-380009 | ||
IDBI Bank Ltd. 46A, Gautam Nagar Race Course Road, Vadodara - 390009. | ||
Axis Bank Ltd. B-2 & B-3, Sector 16, Noida Main Branch Noida | ||
IndusInd Bank Ltd. World Business House, M.G. Road Near Parimal Garden, Ellis Bridge Ahmedabad-380006. | ||
HDFC Bank Ltd. 6th Floor, Midway Heights, Nr. Panchmukhi Hanuman Temple, Kala Ghoda, Raopura, Vadodara 390 001 | ||
ING Vysya Bank Ltd. Plot No. C-12, G Block, 8th Floor, BKC, Bandra (East), Mumbai 400051 | ||
Seller: | HSBC Bank USA, National Association 2 Hanson Place, 14th Floor, Brooklyn, New York, NY 11217 USA | |
S.W.I.F.T.: MRMDUS33 Telex: 62822 MMB NY Speedlink: MMLCR | ||
Actual Bank connection: American Superconductor Corporation 64 Jackson Road, MA 01434, Devens, USA |
Confidential Portions of this Exhibit marked as [**] have been omitted pursuant to a request for
confidential treatment and have been filed separately with the Securities and Exchange Commission.
Confidential Treatment Requested by
American Superconductor Corporation
Down payment (cash): Silicon Valley Bank 3003 Tasman Drive, Santa Clara CA 95054, USA Swift: SVBKUS6S Aba #: 121140399 Account no: [**] | ||
Intermediary bank: Standard Chartered Bank (Frankfurt) GmbH Frankfurt, Germany SCBLDEFX | ||
Letter of Credit: HSBC Bank USA, N.A 452 Fifth Avenue New York, N.Y Swift: MRMDUS33 Aba #: 021001088 Account no: [**] |
4. The Seller shall supply the following documents:
4.1 | Commercial invoice in total amount of the goods; |
4.2 | Original packing list in 3 copies issued by the seller; |
4.3 | Original Certificate of Origin issued by Sellers Chamber of Commerce |
4.4 | FCR (Forwarders Certificate of Receipt) |
Delivery notice:
Seller shall complete the delivery of ECS in batches and on time as required in article 2. Buyer will be informed about the exact date of shipment in advance. Buyer shall take delivery of the shipment according to the schedule specified in Article 2 above. Proper handling documents shall be provided to the Buyer beforehand for Buyers safe handling.
5. Packing and Marking:
5.1 Unless otherwise specified in the Contract, the ECS sets shall be packed by Seller in a proper manner for long-distance and sea transport. In case Buyer request a change in the packaging of the ECS and such request results in additional costs to the Seller, Buyer shall pay Seller such additional costs prior to Seller complying with such request. The Seller shall be responsible for repairing or replacing any Products that are corroded, damaged or lost during transit due to Sellers improper packaging or incorrect protection measures. Buyer and / or its appointed representative may inspect the ECS sets and its packaging at Buyers sole cost and expense. Seller shall notify Buyer 20 days before delivery to afford Buyer time to inspect the ECS and its packaging. If Buyer does not arrive at the site 7 days before shipment, it shall be deemed that Buyer abandons the right to inspect.
The following documents shall be enclosed on each package of the ECS sets:
| One copy of detailed packing list; |
| Two (2) Shipping Marks showing the consignees address, PL-Number and number of each package. |
Confidential Portions of this Exhibit marked as [**] have been omitted pursuant to a request for
confidential treatment and have been filed separately with the Securities and Exchange Commission.
Confidential Treatment Requested by
American Superconductor Corporation
6. Intellectual Property Right (IPR):
Seller shall indemnify, defend and hold Buyer harmless against all claims, liabilities, damages, expenses, judgments and losses (including reasonable attorneys fees) (Losses) arising from alleged infringement of any patent as a result of Buyers use of the ECS sets, provided Buyer provides to Seller prompt written notice of any claim, reasonable assistance, and control over the negotiation, litigation, and settlement of such claim.
In the event that a final injunction is obtained against Buyers use of the ECS sets, or if in Sellers opinion any ECS sets may become the subject of an injunction, Seller may, at its option and expense, (i) procure for Buyer the right to continue using the ECS sets, (ii) replace or modify the ECS sets so that it becomes non-infringing, or (iii) accept the return of the ECS sets and refund to Buyer the purchase price therefore as depreciated on a straight-line 5 year basis. Seller may withhold further shipments of any such ECS sets.
Seller shall not have any liability or responsibility to Buyer to the extent that any infringement or claim thereof or injunction is based upon:-
(i) | use of ECS sets in combination with equipment or software not supplied by Seller where the ECS sets would not itself be infringing, |
(ii) | compliance with Buyers designs, specifications or instructions, |
(iii) | use of ECS sets in an application or environment for which it was not designed or not contemplated hereunder, |
(iv) | use of ECS sets in any particular application or environment if use in any other application or environment would not be infringing, |
(v) | modifications of ECS sets by anyone other than Seller, or |
(vi) | any claims of infringement of any patent in which Buyer or any affiliate or customer of Buyer has an interest or license |
7. Inspection:
Buyer is obligated to inspect ECS sets immediately after delivery. If the ECS sets appears not to conform to the respective Contract, Buyer shall notify Seller of such conditions in writing immediately, latest within thirty (30) calendar days from receipt thereof or in case of hidden defects within thirty (30) calendar days from detection, and afford Seller a reasonable opportunity to inspect the ECS sets. Otherwise, the ECS sets shall be deemed approved by Buyer leading to the termination of Sellers warranty obligations. No ECS sets shall be returned without Sellers consent.
If the two Parties cant reach an agreement during the inspection, they can first resolve it through negotiation. If the dispute cannot be resolved through negotiation within 10 days, the Parties may engage an internationally-renowned quality inspection company to inspect the ECS. Fees for such inspection shall be shared equally by the Parties. The Parties shall accept the inspection result of the quality inspection company.
8. Warranty:
Subject to below section 18, Limitations of Liability, Seller warrants the ECS sold by Seller to be free from defects in material and workmanship under normal use and service for a period of [**] ([**]) months from the date the ECS are put into service (but in case of PM 3000 it will be [**] months) or [**] ([**]) months from the date of delivery, whichever occurs first, on the condition that payment as provided in Articles 1, 2 of Article 3.1 is made and received in full and without delay. Sellers sole obligation and Buyers exclusive remedy under this warranty shall be for Seller, at its sole choice, to repair or replace parts proven to be defective within the stated warranty period. Repair or replacement of parts under this warranty shall be done on DDP AMSC India basis. Title and risk of loss or damage of ECS sets replaced under warranty passes to Buyer in accordance with the Contract as agreed between Seller and Buyer. If Seller determine that the ECS sets for which Buyer has requested warranty service is not eligible for warranty service for any reason, Buyer shall pay or reimburse Seller for all costs of investigating and responding to such request at Sellers then prevailing time and materials rates. The warranty for any repaired or replaced parts shall be the balance of the [**] warranty period.
Confidential Portions of this Exhibit marked as [**] have been omitted pursuant to a request for
confidential treatment and have been filed separately with the Securities and Exchange Commission.
Confidential Treatment Requested by
American Superconductor Corporation
Exclusions from Warranty - This warranty shall not apply to: ECS that have been repaired or altered other than by Seller in any way so as, in Sellers judgment, to affect its reliability; ECS which have been subject to misuse, negligence, or accident, or operating manual instructions/recommendations have not been followed; ECS for which recommended preventative maintenance has not been followed; material defects caused by normal wear; or equipment that is experimental, developmental or supplied for evaluation purposes.
THE FOREGOING LIMITED WARRANTY IS EXCLUSIVE AND IN LIEU OF ALL OTHER WARRANTIES BY SELLER, EXPRESSED OR IMPLIED, ORAL OR WRITTEN, INCLUDING, BUT NOT LIMITED TO, ANY WARRANTY OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE, OR NONINFRINGEMENT.
9. Environment, Occupational Health and Security:
9.1 | If the Buyers inspector carries out inspecting ECS sets at Sellers factory, the Seller should be responsible for providing a safe working environment for the Buyers inspector and shall inform the inspector of any potential dangers. If the working environment is not safe, the inspector may not perform work until the working environment provided and improved by the Seller meets applicable security standards. |
9.2 | When carrying out service in the site of the Buyer, the Sellers staff shall abide Regulation on Security and Environment Management and comply with the reasonable instructions of the Buyers security engineer in the site. |
9.3 | The Sellers packaging materials for packing equipments shall meet environmental requirements. |
9.4 | The Buyer shall take effective measures to ensure not causing bad effect on environments and the Sellers site in any equipment transportation. The Buyer shall be responsible for economical loss of bad effect caused by the Buyers negligence on environment and the Sellers site. |
10. Passing of title and risk:
Risk shall pass to the Buyer based on FCA Shanghai, China and/or any place in Austria, in accordance with INCOTERMS 2010.
It is stated and agreed that the forwarder is allowed and obliged to issue a FCR document for the LC when taking over the goods.
The Forwarder and the mode of transport shall be named by the Buyer at least two weeks before each shipment. If the Buyer doesnt name a forwarder on time, the Seller is allowed to nominate a forwarder of his choice and handover the ECS to place at the Buyers disposal.
All costs arising are on account of the Buyer. Nominated forwarder shall issue FCR-document after receiving the goods. This FCR shall be accepted by Buyer when presented via the LC.
11. Claims:
In case the ECS sets supplied by Seller do not meet the specified technical performance during the warranty period and Seller doesnt fulfill his responsibility, Buyer has the right to lodge claims against Seller, and Seller shall settle a valid claim upon the agreement of Buyer in the following way:
At Sellers option and expense, Seller shall repair or replace the parts proven to be defective.
Confidential Portions of this Exhibit marked as [**] have been omitted pursuant to a request for
confidential treatment and have been filed separately with the Securities and Exchange Commission.
Confidential Treatment Requested by
American Superconductor Corporation
12. Force Majeure:
Neither party shall be held responsible for failure or delay to perform all or any part of this Contract due to flood, fire, earthquake, snowstorm, drought, hailstorm, hurricane, or any other events that are beyond the control of the affected party and could not reasonably be expected at the time of conclusion of the Contract or have been avoided or overcome by such party. However, the party whose performance is affected by the event of Force Majeure shall give a notice to the other party of its occurrence as soon as possible and a certificate or a document of the occurrence of the Force Majeure event issued by the relative authority or a neutral independent third party shall be sent to the other party not later than thirty (30) days after its occurrence. If the Force Majeure event continues for more than One Hundred and Eighty (180) days, both parties shall negotiate the performance or the termination of this Contract. In the case of such a termination either party shall bear its own costs, further claims for compensation in connection with the termination shall be excluded.
13. Taxes and Duties:
13.1 All taxes in connection with and in the execution of the Contract levied by the Indian government in accordance with the tax laws of India shall be borne by Buyer.
13.2 All taxes in connection with and in the execution of the Contract arising outside of India shall be borne by the Seller.
Prices quoted by Seller are exclusive of taxes, and all taxes levied in connection with the entering into and/or performance of this Contract, except for taxes arising outside of India, are the responsibility of and to be borne by the Buyer. Any taxes which Seller may be required to pay or collect, under any existing or future law, upon or with respect to the sale, purchase, delivery, storage, processing use or consumption of the goods covered hereby are not included in the prices defined above and shall, to the extent permissible by law, be for the account of the Buyer, who shall promptly pay the amount thereof to Seller upon demand.
14. Arbitration:
Any dispute, controversy or claim between or among the parties, arising out of or relating to this Contract, or the interpretation or breach thereof, shall be discussed in good faith by members of the senior management of the parties, with a view to an amicable resolution thereof within a 30-day period.
Notwithstanding such good faith actions, in the event that any disputes, controversies, or differences arise between Parties out of or in relation to or in connection with this Agreement, which could not be solved by amicable resolution between the Parties, within 30 days from the commencement of such consultation, such unresolved disputes, controversies or differences shall be finally settled by arbitration pursuant to the rules of the Singapore International Arbitration Centre (SIAC), except where such rules conflict with this provision, in which case this provision controls. Place of arbitration shall be Singapore, unless the Parties, by mutual written agreement, agree to hold the arbitration elsewhere. The language of arbitration proceedings shall be the English language.
The arbitral award is final and binding upon both parties. The number of arbitrators shall be three and the seat of the arbitration shall be Singapore.
15. Late Delivery and Penalty:
In case of delayed delivery of any shipment, starting from the fourth week of delay and should the Seller fail to make the announcement of readiness for dispatch on time as stipulated in the Contract, with exception of Force Majeure causes specified in this Contract the Seller agrees to pay penalty which shall be deducted by the paying bank from the payment. The penalty, however, shall not exceed [**]% of the total value of the goods involved in the late delivery. The rate of penalty is charged at [**]% for every seven days, a delay for more than 4 days (including 4 days) is counted as one complete week. In case the Seller fails to make delivery ten weeks later than the time of shipment stipulated in the Contract, the Buyer shall have the right to cancel the Contract, and the Seller, in spite of the cancellation, shall still pay the aforesaid penalty to the Buyer without delay. This penalty shall be Sellers exclusive liability for delay under this Contract or otherwise.
Confidential Portions of this Exhibit marked as [**] have been omitted pursuant to a request for
confidential treatment and have been filed separately with the Securities and Exchange Commission.
Confidential Treatment Requested by
American Superconductor Corporation
16. Applicable Law:
This Supply Contract shall be governed by and interpreted in accordance with rules of Singapore.
17. Software:
Notwithstanding any references herein to title, software provided in or with the ECS is licensed and not sold. Buyer shall not copy or modify the software and shall not transfer the software except with the transfer of the ECS, provided no copy of the software is retained. Buyer agrees to use software only as it is required to be used in the ECS, that it will treat the software as Sellers confidential information and not disclose it except if the disclosure is required under order of any judicial or administrative authority, law or regulations applicable to the Buyer, disclosure required by the Government, agency or regulatory authority having jurisdiction over the Buyer or the rules and regulations of any regulated market or recognized stock exchange, and not to reverse engineer, disassemble, decompile or otherwise alter the software; provided, however, that if reproduction of the code and translation of its form are necessary to obtain the information required to achieve the interoperability of the software with other programs and if such access and use to the code is mandated by applicable law, Buyer shall inform Seller in writing accordingly and Seller shall notify Buyer within twenty (20) business days from receipt of Buyers request that (i) Seller will perform the work in order to achieve such interoperability and charge a reasonable expense allowance for such work to Buyer, or (ii) Buyer itself is entitled to undertake those actions, but only to the extent required to achieve the interoperability of the software with other programs.
18. Termination:
Failure to Pay: The Seller may, by written notice of default sent to Buyer, terminate the Contract in whole or in part if Buyer fails to arrange payment as provided in Article 3 and such breach continues for more than ninety (90) days for reasons other than Force Majeure. In this case, if Seller has started production of the ECS, Buyer shall reimburse Seller for the costs incurred. If the ECS has been delivered to the Buyer, the Seller may require the Buyer to return such ECS at Buyers expense.
Termination for Breach: If either party breaches this Contract, the non-breaching party shall have the right to terminate this Agreement by providing written notice of termination if the breach has not been cured within fifteen (15) days following receipt of written notice of the breach. The non-breaching party shall not be obligated to pay for the breaching partys time or resources to cure any breach.
Termination for Bankruptcy: Either party may, by written notice to the other party, cancel the Contract in the event a party (i) becomes insolvent or admits its inability to pay its debts generally as they become due; (ii) becomes subject, voluntarily or involuntarily, to any proceeding under any domestic or foreign bankruptcy or insolvency law, which is not fully stayed within seven (7) business days or is not dismissed or vacated within ninety (90) days after filing; (iii) is dissolved or liquidated or takes any corporate action for such purpose; (iv) makes a general assignment for the benefit of creditors; or (v) has a receiver, trustee, custodian or similar agent appointed by order of any court of competent jurisdiction to take charge of or sell any material portion of its property or business.
Survival:. The following provisions shall survive any expiration or termination of this Agreement: Section 16(b) [confidentiality], Section 4 [ownership], Section 6 [indemnification], Section 7 [limitation of liability] and Section 12 [relationship of the parties]. The termination or expiry of this Agreement shall be without prejudice to the rights and remedies either party may have against the other or which may have accrued up to the date of, or which arise out of, the termination or expiry of the Agreement.
19. Limitations of Liability:
Both Seller and Buyer acknowledge and accept that, to the extent permitted by law, the total liability of Seller (including auxiliary persons such as Sellers suppliers or manufacturers), on any claim, whether in contract, tort (including negligence), breach of warranty or otherwise, arising out of, connected with, or resulting from the manufacture, sale, storage, delivery, repair, replacement or use of any ECS shall not
Confidential Portions of this Exhibit marked as [**] have been omitted pursuant to a request for
confidential treatment and have been filed separately with the Securities and Exchange Commission.
Confidential Treatment Requested by
American Superconductor Corporation
exceed the loss of Buyer, reasonably foreseeable by Seller at the time of entering into this Contract, which equals to the price of the specific product or service which gives rise to the claim. The claim for each ECS shall not exceed the value of ECS. Both Seller and Buyer acknowledge and accept that, in the case of IPR infringement, the liability of Seller shall be limited to the value defined in Technology Transfer and License Agreement dated 17th April 2009 between Seller and Buyer and its amendments, which is the Loss of Buyer, reasonably foreseeable by Seller at the time of entering into this Contract, and Sellers liability on all such claims shall expire upon the expiration of the limited warranty. To the extent permitted by law, SELLER (INCLUDING AUXILIARY PERSONS SUCH AS SELLERS SUPPLIERS OR MANUFACTURERS) SHALL NOT BE LIABLE TO BUYER OR ANY THIRD PARTY FOR ANY SPECIAL, INCIDENTAL OR CONSEQUENTIAL, EXEMPLARY, OR OTHER INDIRECT DAMAGES, OR FOR LOSS OF PROFITS OR REVENUES, LOSS OF USE OF THE ECS OR ANY ASSOCIATED WORK, COST OF CAPITAL, CLAIMS OF CUSTOMERS FOR SERVICE INTERRUPTIONS, AND COSTS INCURRED IN CONNECTION WITH PROCURING SUBSTITUTE GOODS.
20. Severability:
In the event that any one or more of the provisions of this agreement shall for any reason be held to be unenforceable in any respect under the law of any state or country, such unenforceability shall not affect any other provision, and this Contract shall then be construed as if such unenforceable provisions had never been contained herein. The invalid provision shall be replaced by a valid and/or enforceable one, which comes as close to the intended meaning of the parties as possible.
21. Notices:
Any notice or communication required or permitted hereunder shall be in writing and shall be deemed effective on receipt. For the avoidance of doubt, any notice or communication mailed certified or registered mail, postage prepaid and return receipt requested shall be deemed received five (5) business days after being mailed or on the date of delivery if delivered in person or by express carrier to the last known address of the other party.
22. Compliance with Law:
Buyer shall comply with all applicable governmental laws, ordinances, codes, rules, regulations and orders in its performance hereunder, and shall obtain all permits or licenses required in connection with the purchase, shipment, installation and use of any of the ECS.
23. Restrictions on Buyers Use and ReSale of Products:
Buyer shall only use the Products sold to it by Seller adapted for use with the developed wind turbine in the Technology Transfer and License Agreement dated 17th April 2009, along with its amendments, between Seller and Buyer and Buyer may not resell to parties other than owners of the Sellers wind turbine developed under the aforementioned agreement.
24. Export Restrictions:
Export Restrictions- The Buyer shall be responsible for any required export/import licenses. The obligation of the Buyer to pay for the products shall not in any manner be waived by the delay or failure to secure or renew, or by the cancellation of any required export/import licenses. Buyer agrees to comply with United States Export Administration Regulations as in effect from time to time and will not re-export any products or data or sell, license or otherwise distribute products or data to any party in violation of applicable regulations of the United States Department of State or Department of Defense. Buyer will use best efforts to obtain similar assurances from is customers. Buyer will also maintain the necessary records to comply with United States Export Administration Regulations.
25. Effectiveness of the Contract and Miscellaneous:
The Contract becomes valid on signing by the authorized representatives of the two parties however the Contract shall become null and void automatically when each party of the Contract has fulfilled its rights and obligations under the Contract. Notwithstanding anything to the contrary herein, Articles 6, 17, 19, 23 and 24 of this Contract shall still be valid.
Confidential Portions of this Exhibit marked as [**] have been omitted pursuant to a request for
confidential treatment and have been filed separately with the Securities and Exchange Commission.
Confidential Treatment Requested by
American Superconductor Corporation
At the expiration of the contract, any unsettled credit and debt under the contract shall not be affected by the expiration of the contract. The debtor shall still effect his obligation of reimbursement to the creditor.
The Contract shall be written in English as one complete set. The Contract shall be made in two original sets, one set for each Party.
All amendments, supplements and alternations to the terms and conditions of the contract shall be made in written form and signed by the authorized representatives of the two parties.
No assignment of any right or obligation under the contract shall be made by either party to a third party without the previous consent of the other party.
The communication between the two parties shall be conducted in written form. The fax concerning the important matter shall be confirmed timely by the registered or express mail.
Inox Wind Limited | AMERICAN SUPERCONDUCTOR | |||||||
BY: | /s/ Rajeev Gupta |
BY | /s/ James F. Maguire | |||||
NAME: | Rajeev Gupta |
NAME: | James Maguire | |||||
TITLE: | Director |
TITLE: | EVP Wind Segment | |||||
DATE: | January 29, 2013 |
DATE: | February 8, 2013 |
Confidential Portions of this Exhibit marked as [**] have been omitted pursuant to a request for
confidential treatment and have been filed separately with the Securities and Exchange Commission.